GRAY SLEEVELESS JACKET

The men's sleeveless jacket connected by spokes simple elastic band from yarn of universal gray color will approach practically under any clothes. The model very simply, in power to the even beginning knitter matches.


Sizes: S/M/L/XL
It will be required to you: 350/350/400/400 g of gray yarn of Lima (20% alpaca, 80% of wool, 110 m / 50); spokes No. 3,5.








Elastic band 3/2, spokes No. 3: alternately 3 persons., 2 izn.


Description of knitting of men's sleeveless jacket:


Back: to type 137/147/157/167 items and to knit elastic band 3/2. Through 39/39/40/40 cm = 116/116/120/120
to close the river from type-setting edge for proym from both parties of 9 items. Then to lower at distance of 8 items from edge in every 2 rivers 7 x 1 items and in every 4 rivers 3 x 1 items, for this purpose at the beginning of row to tie 3 faces., 3 izn., 2 persons., to provyazat 2 items together izn., at the end of row to provyazat 2 items together izn., 2
persons., 3 izn. 3 persons. = 99/109/119/129 items. Through 58/59/61/63 cm = 174/178/184/190 rubles from type-setting edge to close for shoulder bevels from both parties of 4 items and in every 2 rivers 5 x 4, 1 x 3 items / 3 x 4 and 3 x 5 items / 5 x 5 and 1 x 6 items / 2 x 5 and 4 x 6 items. In the following row to close the remained 45/47/49/53 items.


Before: to knit, as back, but with V-shaped cut. For this purpose through 47/47/48/48 cm = 142/142/146/146 rubles from type-setting edge to close average loop and to graduate from both parties separately. At first to knit the left half: the following row to knit to the closed average loop, to postpone the remained 49/54/59/64 items for the right side. Further to diminish 1 item at distance of 8 items from edge of cut as follows: 3 persons., 3 izn., 2 persons., to provyazat 2 items together izn., to provyazat row up to the end. To connect 1 river on the remained 48/53/58/63 items. In the following row to tie 3 faces., 3 izn., 2 persons., to provyazat 2 items together izn., to provyazat row up to the end. To connect 1 river on the remained 47/52/57/62 items. In the following row to lower 1 item at distance of 8 items from edge of cut. To connect 1 river on the remained 46/51/56/61 items. Then to lower 1 item at distance of 8 items from edge of cut of 19 more times in every 2 rivers of/20 times in every 2 rivers of/21 times in every 2 rivers/23 times in every 2 rivers. To connect 1/1/1/3 more rubles. on the remained 27/31/35/38 items. In the following row to close all loops. Then to knit the right half, for this purpose to transfer the postponed 49/54/59/64 items to spokes and to connect 1 river. To knit the following row to
that time. so far on the left spoke there will be no 10 items, then to provyazat 2 items together izn., 2 persons., 3 izn., 3 persons. To connect 1 river on the remained 48/53/58/63 items. To knit the following row until on the left spoke there are no 10 items, then to provyazat 2 items together izn., 2 persons., 3 izn., 3 persons. To connect 1 river on the remained 47/52/57/62 items. In the following row to lower 1 item at distance of 8 items from edge of cut. To connect 1 river on the remained 46/51/56/61 items. Then to lower 1 item at distance of 8 items from edge
cut of 19 more times in every 2 rivers of/20 times in every 2 rivers of/21 times in every 2 rivers/23 times in everyone
2 rivers. To connect 1/1/1/3 more rubles on the remained 27/31/35/38 items. In the following row to close all loops.

Assembly: to execute humeral and lateral seams.






-

No comments:

Post a Comment