OPENWORK JACKET WITH SLEEVES - BELLS

Impressive spacious jacket with sleeves bells from Liza Hoffman which will be ideally suited for special cases. The main part of product of more strong color from braids, rhombuses and elements of lace is connected by integral piece to armpits with pattern. Lighter upper part is decorated with pattern from braids and pattern in scar. Openwork jacket coat of classical breed it is decorated with the edges trimmed with pattern combs. Sizes: Small, Medium, Large, H-Large, XX Large. In the photo the Small size model is shown.


lt;


Sizes: Breast girth (in the clasped look) 96.5 (104, 111.5, 119, 124.5) cm. Length is 89 (90,91.5,92.5,94.5) cm.


Materials: 12 (13, 15, 16, 16) hanks on 50 g (length of everyone apprx. 191 yards / 175 m) yarn of Artyarns Ultramerino (wool) of dark-violet color (No. 239) (And); 2 (2,3,3,3) hanks on 25 g (length of everyone apprx. 312 yards / 285 m) yarn of Artyarns Silk Mohair Glitter (mohair/silk) of dark-violet color (#239) (B); circular spokes number 3, 5 and 7 (3.25, 3.75 and 4.5 mm) 80 cm long or diameter which will allow to connect sample correctly. Hook number F/5 (4 mm); auxiliary spoke for knitting of braids, markers and pins for loops; three buttons with a diameter of 20 mm


Knitting density: 28 items and 34 rubles = 10 cm openwork pattern according to the scheme 1 thread of color A spokes number 3 (3.25 mm); 25 items and 28 rubles = 10 cm openwork pattern according to the scheme 2, thread And and In together, on spokes number 3 (3.25 mm). Attention! Surely connect sample.


Symbols: 5-st RC (5 l.p. to cross to the right) to Remove 3 items on auxiliary spoke for work, 2 l.p., to provyazat front 3 items from auxiliary spoke. 3-st RC (to cross 3 l.p. to the right) to Remove 2 items on auxiliary spoke for work, 1 l.p., to provyazat front 2 items from auxiliary spoke.


Notes: 1. To minimize, heterogeneity of color which is inevitable when using thread of manual dyeing, it is necessary to knit from 2 balls at the same time, i.e. 2 rubles from one and 2 rubles - from another. 2. The scheme 1 knit only in the color A. The scheme 2 matches thread And and In at the same time, same spokes, as bodice. 3. The scheme 2 the reduced copy of the scheme 1, braids proceed, as well as earlier.


Main detail: On circular spokes number 3 (3.25 mm) to dial 315(339, 363, 387,411) the item the 1st row (HP) - all loops to knit the front. 2nd row 1 l.p., to knit the item, back to the last, 1 l.p. the 3rd ryad1 l.p. (edging), rm, * 7 l.p., l2vm with inclination to the left, 3 l.p. for back wall, nakid, 1 l., nakid, 3 l.p. for back wall, l2vm, 6 l.p., rm; to repeat from * 12 more (13, 14, 15, 16) time, 1 l.p., rm, 1 l.p. (edging). The 4, 6, 8, 10 and 12 ranks to Repeat the 2nd row. 5th row 1 l.p., * 7 l.p., l2vm with inclination to the left, 2 l.p. for back wall, nakid, 1 l.p., nakid, l2vm with inclination to the left, nakid, 2 l.p. for back wall, l2vm, 6 l.p.; to repeat from to finish 2 l. 7th row 1 l.p., * 7 l.p., l2vm with inclination to the left, 1 l.p. for back wall, nakid, 1 l.p., (nakid, l2vm with inclination to the left) twice, nakid, 1 l.p. for back wall, l2vm, 6 l.p.; to repeat from *, to finish 2 l.p. 9th row 1 l.p., * 7 l.p. l2vm with inclination to the left, nakid, 1 l.p., (nakid, l2vm with inclination to the left) 3 times, nakid, l2vm, 6 l.p.; to repeat from *, to finish 2 l.p. 11th row 1 l.p., * 5 l.p., (l2vm with inclination to the left) twice, 3 l.p., nakid, 1 l.p., nakid, 3 l.p., (l2vm) twice, 4 l.p.; to repeat from *, to finish 2 l.p. 13th row 1 l.p., * 3 l.p., (l2vm with inclination to the left] twice, 3 l.p., nakid, 3 l.p., nakid, 3 l.p., (l2vm) twice, 2 l.p.; to repeat from *, to finish 2 l.p. the 14th row to Repeat the 2nd row - 263 (283, 303, 323, 343) items. To remove markers.


Beginning of work as pattern on the scheme 1 Note: To begin the scheme 1 in the 5th row. to Begin the 5th row (HP) with the first with the item of the 5th ruble, to provyazat to the line of repetition, to repeat the 20th item 12 (13, 14, 15, 16) of times, to knit until the end of the scheme. To continue to knit pattern according to the scheme 1 as it is described to the 36th ruble, then to repeat 1 - the 36th ruble of 5 more times. Detail length - apprx. 68.5 cm from the beginning. Now to knit thread of color A and B at the same time. To finish each detail sl. in a way:


Division of the coquette Only for razmerasmall Sl. row (HP) Thread of color A and B at the same time, 1 l.p. (edging), 3 l.p., 3 nominative, (3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative) 2 times, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative; to remove these 55 items on pin for the right shelf; to cut off thread, to remove sl. 14 items on pin, (for armhole of the right shelf and back) then to knit back loops sl. in a way: 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative, (3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative) 5 times, 3 l.p. — 105 items of back to remove sl. 14 items on pin (armhole of back and the left shelf) to remove the remained 59 items on pin for the left shelf. To turn and knit sl. river on IS only on back loops, according to the scheme 2, but drawing, provyazyvy l.p. - front, and nominative - back.


Only for razmeramedium Sl. row (HP) Thread of color A and B at the same time, 1 l.p. (edging), 3 l.p., (3 nominative, 3 l.p., nakid to lower 3 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l., l2vm, 3 nominative) 3 times to remove these 58 items on pin for the right shelf; to cut off thread, to remove. 14 items on pin, (for armhole of the right shelf and back) then to knit back loops sl. in a way: 1 nominative, l2vm, 1 l.p., l2vm, [3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm] 6raz, 1 nominative — 113 items of back to remove sl. 14 items on pin (back armhole p the left shelf) to remove remained 64 and. on pin for the left shelf. To turn and knit sl. river on IS only on back loops, according to the scheme 2, on drawing, provyazyvy l.p. - front, and nominativeback.


Only for razmeralarge Sl. row (HP) Thread of color A and B at the same time, 1 l.p. (edging), 3l.p., [3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative) 3 times, 3 nominative, 3 l.p., to remove these 64 items on pin for the right shelf; to cut off thread, to remove sl. 14 items on pin, (for armhole of the right shelf and back) then to knit back loops sl. in a way: (3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm) 6 times, 3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative — 123 and. backs to remove sl. 14 and. on pin (armhole of back and the left shelf) to remove the remained 70 items on pin for the left shelf. To turn and knit sl. river on IS only on back loops, according to the scheme 2, on drawing, provyazyvy l.p. - front, and nominative - back.


Only for H-Large size 1st row (HP) Thread of color A and B at the same time, 1 l.p. (edging), 3 l.p., 3 nominative, [3 l.p., nakid to lower 3 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative] 3 times, 3 l.p., nakid to lower 2 l.p. broach, nakid, 2 l.p., to remove these 69 items on pin for the right shelf; to cut off thread, to remove sl. 14 items on pin, (for armhole of the right shelf and back) then to knit back loops sl. in a way: 1 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., (3 nominative, l2vm, 1 l.p., l2vm, 3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p.) 6 times, 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative, 3 l.p., nakid to lower 2 l. broach, nakid, 1 l.p. — 131 items of back to remove sl. 14 items on pin (armhole of back and the left shelf) to remove the remained 75 items on pin for the left shelf. To turn and knit sl. river on IS only on back loops, according to the scheme 2, on drawing, provyazyvy l.p. - front, and nominative - back.


Only for razmeraxx-Large Sl. row (HP) 1 l.p. (edging), 3 l.p., 3 nominative, (3 l.p., nakid to lower 3 l.p. broach, nakid, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative) 3 times, 3 l.p., nakid to lower 2 l.p. broach, nakid, 3 l.p., 3 nominative; to remove these 73 and. on pin for the right shelf; to cut off thread, to remove sl. 14 items on pin, (for armhole of the right shelf and back) then to knit back loops sl. in a way: [3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative, 3 l.p., nakid to lower 2 l.p. broach, nakid] 7 times, 3 l.p., 3 nominative, l2vm, 1 l.p., l2vm, 3 nominative, 3 l.p. — 141 items of back to remove sl. 14 items on pin (armhole of back and the left shelf) to remove the remained 79 items on pin for the left shelf. To turn and knit sl. river on IS only on back loops, according to the scheme 2, but drawing, provyazyvy l.p. - front, and nominative - back.


For all sizes 55 (58, 64, 69, 73) items for the right shelf which provyazyvat in the color A and B at the same time, by 105 (113, 123, 131, 141) items - backs Are postponed, provyazyvat in the color A and B at the same time, and 59 (64, 70, 75, 79) items of the left shelf which knit only in the color A (on the left shelf of ubavka are not executed yet).


Performance proym raglan on back the 1st number (ubavka) (HP) 3 l.p., l3vm with inclination to the left to knit the pattern according to the scheme 2 to the last 6 items, l3vm, 3 l.p. To repeat the 1st number of ubavka in every second row of 6 more (6,8,8, 10) times. 2nd number (ubavka) (HP) 3 l.p., l2vm with inclination to the left to knit the pattern but the scheme 2 to the last 5 items, l2vm, 3 l.p. To repeat the 2nd number of ubavka in every 2nd number of 18 more (20, 20, 22, 22) times - 39 (43, 45, 49, 51) items. To close loops.


The right shelf to Tie up thread with IS and to knit 55 (58, 64, 69, 73) items postponed for the right shelf, to execute back armhole, AT THE SAME TIME, when on spokes there will be 32 (33, 35, 38, 38) items, to execute mouth. For this purpose to close 4 (5,6,6,6) items from edge of mouth once, 3 (3,4,4, 4) items - 1 (1, 1, 2, 2) time, 2 and. twice, 1 item - 6 (6,6, 5, 5) times. To close the remained 5 loops.


The left shelf to Tie up thread of color A and B at edge of armhole and to execute number of ubavka as on the right shelf, according to the scheme 2. 55 (58, 64, 69, 76) items have to turn out. To finish as the right shelf. To knit symmetrically.


Sleeves On circular spokes number 3 (3.25 mm) to dial 123 (123,147,147,147) items of the 1-14th river to knit as on back. In the 14th ruble on spokes of 103 (103,123,123,123) items.


Beginning of work as pattern on the scheme 1 Note: To begin the scheme 1 in the 5th row. to Begin the 5th row (HP) with the first with the item of the 5th ruble, to provyazat to the line of repetition, to repeat the 20th item 4 (4, 5, 5, 5) of times, to knit until the end of the scheme. To continue to knit pattern according to the scheme 1 as it is described to the 36th ruble, then to repeat 1 - the 3rd ruble 3 more times. Detail length - apprx. 45.5 cm from the beginning. Now to knit thread of color A and B at the same time. To finish each detail sl. in a way: Performance of raglan in upper part of sleeve to Close 7 (7, 8, 7, 7) items at the beginning sl. 2 rubles, AT THE SAME TIME, to execute braid ubavka according to transition from the scheme 1 to the scheme 2, then, to execute ubavka as on back, 1 - y river of ubavka to execute in every 2 rivers of 7 (8, 8, 12, 11) times, and the 2nd ruble of ubavka in every 2 rivers - 19 (20, 22, 20, 23) time. To close the remained 13 (7, 19,9,7) items.


Completion of work: To stretch details by the size. To stitch raglan sleeves. To connect seams of sleeves.


Collar: Two thread (color A and B) on spokes number 3 (3.25 mm) evenly to dial and provyazat 117 (123, 135, 135, 141) item, front along edge of mouth, the 1st number (IS) of 3 nominative, * 3 l.p., 3 nominative; to repeat from * up to the end. To connect 2.5 cm elastic band 3x3. To pass to spokes number 5 (3.75 mm) and to connect elastic band 3x3 5 more cm. To pass to spokes number 7 (4.5 mm) and to knit elastic band until length of collar does not become 15 cm. To close loops freely on drawing.


The level of the left shelf the Hook, thread of color A to tie bottom edge of 4 rubles of the Art./N. Level of the right shelf to knit also. In 4 rubles to execute 3 loops for buttons sl. in a way: 3 accusative to pass 1 st.b.n., 6 st.b.n., to repeat twice, further to knit the Art./N. To sew buttons.


Schemes of knitting of patterns of jacket:



Schematic pattern of jacket:


-

No comments:

Post a Comment