TOP WITH FLOWER BORDER

In this bright summer topic decorated with flower border you will not remain unattended, having a rest on the seashore. The top is executed by hook openwork pattern, and also, decorating waist and cut, small flower motives.


Sizes: 34/36 (38/40)





It will be required to you: 200 (250) g orange, on 50 g of yellow and white yarn of Puntino (100% of cotton, 160 m / 50); hook No. 3,5.


Big flower motive: yellow thread to connect chain from 6 vozd. the item and to close it 1 soyed. the Art. in ring. Further to knit circular ranks according to the scheme 1, thus to execute 1 - y the river of the yellow, 2nd and 3rd river white thread. To execute 1time with 1st on the 3rd river. All following sockets to knit as the 1st socket, connecting them among themselves the Art./N.


Openwork pattern: number of loops multiply 2+ 1+3 vozd. item of rise. To knit according to the scheme 1. To begin with loops before rapport, to repeat rapport loops, to finish with loops after rapport. To execute 1 time with 1st on the 4th river, thus after 1 ruble thread to cut off and execute the 2nd ruble again as persons. river then to repeat the 3rd and 4th ruble, to finish the 5th ruble.


Small flower motive: to knit, as the big socket, but according to the scheme 2.


Main pattern: number of loops multiply 7 + 4 + 1 vozd. item of rise. To knit according to the scheme 3. To begin with loops before rapport, to repeat rapport loops, to finish with loops after rapport. At first to connect persons. river. And to cut off thread and, having begun with faces. river. to execute 1 time with 1st on the 4th river, then to repeat the 3rd and 4th ruble. For additions to repeat the 5th and 6th ruble, to finish the 7th ruble.


Knitting density. Main pattern: 25 items and 12,5 rubles = 10 x 10 cm; openwork pattern: 22,5 items and 11 rubles = 10 x 10 cm; big socket = 6.5 x 6,5 cm; small socket = 4 x 4 cm.


Description of knitting of top:


Back / before: to connect 6 (7) big sockets and to connect them on pattern in strip. For upper part on the upper edge of strip to knit openwork pattern, having executed in 1 ruble of 85 (99) Art. with/N. Through 1 cm = (3,5 cm = 4 rubles) from strip for V-shaped cut to leave to 1 river average loop and to graduate from both parties separately. For bevel of cut to lower from inner edge in each number 23 x 1 of the item according to the scheme 1. At the same time through 6,5 cm = (8 cm = 9 rubles) from strip to leave 7 rubles for proym from outer side of 6 items and in each number 4 x 2 of the item. Through 24 cm = 25 rubles (26,5 cm = 29 rubles) from strip to finish work. For the lower part on bottom edge of strip to knit the main pattern, having executed among And 95 (109) Art. with/N = 11 (13) rapports + initial and final loops. Through 12,5 cm = 15 rubles (14 cm = 17 rubles) from strip to repeat for addition of the 5th and 6th river of the main pattern. Through 31 cm = (33 cm = 41 rivers) from strip to connect 39 rubles the 7th ruble of the scheme 3 and to finish work.


Assembly: to execute humeral and sides vy seams. For level to connect 20 small sockets and to connect them on schematic drawing in square frame. To sew level to cut of mouth, thus identical badges have to match. To tie armholes with 1 river of the Art./N.


Scheme of knitting of top:


-

No comments:

Post a Comment