Model of the long jacket executed by hook expressive relief pattern from cages with hinged pockets, belt and stand-up collar.
Sizes: 36/38 (40/42) 44/46
It will be required to you: 1250 (1300) 1350 of olive yarn of Merino Big Superfein (100% of sheep wool, 120 m / 50); hook No. 4.
Elastic band: number of loops multiply 4 + 1. To knit according to the scheme 1. Each ruble to begin with loops before rapport, to repeat rapport, to finish with loops after rapport. To connect 1 time with 1st on the 4th river, then to repeat the 3rd and 4th ruble.
Pattern from cages: number of loops multiply 8 + 2. To knit, as elastic band, but according to the scheme 2. To connect 1 time with 1st on the 7th river, then to repeat with 2nd for the 7th river.
Relief Art. with/N: each ruble to begin with 2 vozd. and to finish with the item of rise 1 semi-Art. in vozd. item of raising of the previous ruble. To knit in persons. river relief Art. with/N for front wall, in izn. river - relief Art. with/N for back wall.
Knitting density: 15 items and 10 rubles = 10 x 10 cm.
Description of knitting of jacket:
Back: to connect chain from 73 (81) 89 vozd. item + 3 vozd. the item of rise and to connect for level 7 cm elastic band. Then to knit pattern from cages, thus in 1 ruble to add 1 item = 74 (82) 90 items. Through 54 (57) 60 cm from level to lower for proym from both parties of 4 items and in each ruble 2 x 1 items = 62 (70) 78 items. At height proym to leave 21 (22) 23 cm for shoulder bevels from both parties of 15 (18) 21 items, on the remained 32 (34) 36 items to connect 3 more cm for collar and to finish work.
Left shelf: to connect chain from 41 (45) 49 vozd. item + 3 vozd. the item of rise and to connect for level 7 cm elastic band. Then to knit pattern from cages, thus in 1 ruble to lower 1 item = 40 (44) 48 items. To begin with loop before rapport, to repeat rapport, to finish with loops to arrow A (B) A and loop after rapport. To execute on the right side armhole and bevel of shoulder, as on back. To finish work on the remained 19 (20) 32 items for collar at back height.
Right shelf: to knit symmetrically.
Sleeves: to connect chain from 41 (45) 49 vozd. item + 3 vozd. the item of rise and to knit elastic band. For bevels of sleeve to add from both parties in every 8th ruble 4 x 1 items = 49 (53) 57 items. Through 40 (40) 38 cm from type-setting edge to lower for cap of sleeve from both parties of 4 items and in each ruble 2 x 1 items = 37 (41) 45 items. At the height of okat of 13 cm to leave from both parties of 1 item and in each ruble 3 x 1, 1 x 2 item. To finish work at the height of okat of 18 cm.
Pockets (2 details): to connect chain from 25 vozd. the item to connect 16 cm elastic band and to finish work.
Ties (2 details): to connect chain from 6 vozd. item + 2 vozd. the item of rise to connect 50 cm relief Art. with/N and to finish work.
Assembly: to execute humeral seams and seams of collar: to stitch sleeves, to execute seams of sleeves and lateral seams. To sew pockets and ties.
Scheme of knitting of jacket:
-
No comments:
Post a Comment