The openwork jacket for the girl is connected by hook with alternation of two flowers of yarn and two openwork patterns. Smaller openwork on jacket above and large fans of pattern on bottom, are divided by the connected corbel on the overestimated waist.
Sizes: 110/116 (122/128)134/140
It will be required to you: 150 (200) 250 g of pale green yarn of Secondo (55% of cotton, 25% of polyamide, 20% of silk, 125 m / 50); 100 (150) 150 g of white yarn of Linarte (40% of viscose, 30% of cotton, 20% of flax, 10% of polyamide, 125 m / 50 g); hook No. 3.
Attention! We recommend to make pattern full-scale and, putting to it work, to carry out necessary decreases
and additions.
Main pattern 1: to knit according to the scheme 1. To begin with loops before rapport, to repeat rapport loops, to finish with loops after rapport. To execute 1 time with 1st on the 7th river, then to repeat with 2nd for the 7th river, thus with 1st on the 5th river to knit white thread, the 6th and 7th river pale green thread.
The main pattern 2:vyazat according to the scheme 2. To begin with loops before rapport, to repeat rapport loops, to finish with loops after rapport. To execute 1 time with 1st on the 3rd river, then to repeat the 2nd and 3rd ruble.
Knitting density. Main pattern 1: 24 items and 10 rubles = 10 x 10 cm; main pattern of 2:26 items and 11 rubles = 10 x 10 cm.
Description of knitting of jacket hook:
Back: white thread to connect chain from 100 (114) 128 vozd. item + 3 vozd. the item of rise and to knit the main pattern 1. For lateral bevels to lower on pattern from both parties on 5,5 (4.5) 5 cm = 81 (101) 111 items. Through 20 (22) 24 cm from type-setting edge to knit the main pattern the 2nd pale green thread. Through 5 (6) 7 cm from the main pattern 1 to execute on pattern from both parties of armhole. Through 16 (18) 20 cm from the main pattern 1 to leave average 33 (39) 45 items and both parties for cut of mouth to finish separately. Through 18 (20) 22 cm from the main pattern to finish 1 work.
Before: to knit, as back, but with more low neck of mouth. For this purpose through 11 (13) 15 cm from the main pattern 1 to leave average 17 (19) 21 items and to execute from inner edge curve on pattern.
Sleeves: pale green thread to connect chain from 61 (71) 81 vozd. item + 3 vozd. the item of rise and to knit the main pattern 2. Through 5 (6) 7 cm from type-setting edge to execute cap of sleeve on pattern. Through 15 (16) 17 cm from type-setting edge to finish work.
Assembly: to execute humeral seams, to stitch sleeves, to execute lateral seams and seams of sleeves. All edges to tie with pale green thread of 1 river of the Art./N and 1 river of rachy step (the Art./N from left to right). For corbel pale green thread to connect chain from 110 (120) 130 vozd. the item and to tie her 2 rubles of the Art./N. To stretch corbel through the last number of the main pattern 1.
No comments:
Post a Comment