THE JACKET CONNECTED AROUND

The openwork jacket connected by hook around with beautiful pattern on back and wavy border turns out surprising coloring when using yarn of section dyeing.


Sizes: 36/38 (40/42) 44/46
It will be required to you: 850 g of yellow-lilac (color 22) yarn of Ocean (100% of cotton, 110 m / 50); hook No. 4 (4,5) 5.



Main pattern: to knit according to the scheme 1 circular ranks, beginning everyone number of the specified quantity vozd. the item of rise and closing row 1 soyed. St.
Openwork pattern: circle, river: to knit according to the scheme 2, beginning each row with the specified quantity vozd. the item of rise and closing row 1 soyed. Art.; straight lines and return ranks: to knit according to the scheme 3, beginning each row with the specified quantity vozd. item of rise.
Knitting density, openwork pattern: 4,5 rapports and 9 rubles = 10 x 10 (10,5 x 10,5) 11kh11sm.


Связанный по кругу жакет


Attention! Back and shelves match uniform cloth around. To receive thing of the bigger size, it is necessary to take bigger hook (the number of the gathered loops does not change).
Data for the size 36/38 are specified by turquoise color before brackets, for the size 40/42 in the pink color in brackets, for the size 44/46 in the green color behind brackets.


Description of knitting of jacket hook:


Back and shelves: to connect chain from 7 vozd. the item to close in ring 1 soyed. the Art. and to knit the main pattern. After the 18th circle. river in work of 60 groups of 3 Art. with/N. In trace. circle. river for one armhole to pass 10 groups of 3 Art. with/N, having executed 40 vozd. the item, the following 16 groups to provyazat for upper part of back, for the second armhole to pass 10 groups, having executed 40 vozd. the item and to provyazat the remained 24 groups. Vozd. the item in the 20th circle. again to provyazat river according to pattern, having executed 10 groups of 3 Art. with/N. After the 39th work to finish circle, river.
Sleeves: to connect chain from 48 vozd. the item to close in ring 1 soyed. the Art. and to knit openwork pattern circle, river, thus to execute 12 rapports. Number circle. by river it is specified near the scheme. To carry out additions according to the scheme. After the 40th circle. river to divide work and to connect with 41st on the 47th river openwork pattern according to the scheme 3. To begin with loops before rapport, to repeat loops of rapport of 5 times, to finish with loops after rapport. To execute decreases for okat from both parties according to the scheme. After the 47th ruble from type-setting edge to finish work.
Assembly: to stitch sleeves.

-

No comments:

Post a Comment