OPENWORK JACKET

The jacket connected by spokes with expressive patterns on upper part and on the lower does model expressive, womanly and beautiful. For knitting of jacket choose qualitative yarn.


It is REQUIRED to YOU: 550 g of beige yarn (70% of viscose, 20% of flax, 10% of polyamide, 125 m / 50); spokes No. 4,5; hook No. 3; 4 buttons.



Patterns on spokes:


Front smooth surface: persons. river - persons. item, izn. river - izn. item;


Openwork pattern 1 (19 items): to knit according to the scheme;


Ажурный жакет



Ажурный жакет



Openwork pattern 2 (the number of the item is multiple 5 + 2 Krom. item):


1river: persons. item;


2ndruble: izn. item;


3rdruble: persons. item;


4thruble: Krom. item * 1 izn. the item, 2 nakid to repeat from * until the end of river, Krom. item;


5th ruble: Krom. * 5 loops to remove the item, thus to dump nakida and to extend loops, to throw loops again on the left spoke and to provyazat all 5 loops one the front crossed loop together, 1 nakid, to provyazat 1 item from 5 items, 1 nakid, 1 item from 5 loops, we will receive 5 new items, to repeat from *, Krom. item.


6thruble: izn. item;


7th, 9th ruble and 11th river: persons. item;


8th and 10th ruble: izn. item. To repeat with 4th on the 11th river.
Hook: vozd. loop, the Art. without nakid, rachy step.


KNITTING DENSITY
Openwork pattern 1: 22 items x 34 rubles = 10 x 10 cm;


Openwork pattern 2: 22 items x 25 rubles = 10 x 10 cm;


Front smooth surface: 22 items x 30 rubles = 10 x 10 cm.


Description of knitting of jacket spokes:


BACK: On spokes to type 116 items and to knit according to the scheme directly openwork pattern 1, having repeated pattern rapport among 6 times and in height of 13 times. At the height of 46 cm from the beginning of work to execute 2 rows front loops. Further to continue work as openwork pattern 2, having added 1 loop in 1 ruble, we will receive on spokes of 117 items. To finish pattern with the 5th number of the scheme and in the last row to provyazat all loops the back. At the same time on to close from inner edge in every 2 rivers 1 x 5 item, 1 x 3 item and 1 x 1 item. At the height of 66,5 cm to close the remained 27 (33) items of shoulder from the beginning of work.
To graduate from the second party symmetrically.


BEFORE: To knit, as back, but with more low neck of mouth. For this purpose at the height of 56 cm to close the central 20 items and both parties from the beginning of work to finish separately. For curve of cut of mouth to close from inner edge in every 2 rivers 1 x 3 item, 2 x 2 items, 5x1 items and in the following of 4 rivers.
1 x 1 items. At height of back to close the remained 27 (33) items of shoulder.


To graduate from the second party symmetrically.


SLEEVES: On spokes to type 54 items and to distribute them as follows: 1 Krom. the item, 14 items of diagonal In, 4 items izn. smooth surfaces, 16 items of braid, 4 items izn. smooth surfaces, 14 items of diagonal And, 1 Krom. the item and to knit in the set sequence.
At the same time for bevels of sleeve to add from both parties in every 4 rivers 31 x 1 items, the added loops to knit izn. smooth surface. At the height of 47,5 cm to close from the beginning of work of 116 items.
The second sleeve to knit also.


ASSEMBLY: Details to humidify, allow a little them to dry. To execute humeral seams. For level on cut of mouth to lift on spokes of 158 items and elastic band 1 x 1 to knit 2,5 cm. To close loops on drawing. To stitch sleeves, to execute lateral seams and seams of sleeves.



-

No comments:

Post a Comment